Infrastructure

Each lot will have its own absorption pit for sewage disposal. Additionally, each lot will also have to construct its own water tank. A water storage tank has been installed to the east of the commercial site, which is to be used for irrigation. The retention pond to the north east of the property will be used to retain storm water run-off as well as for aesthetic purposes. An aerator fountain will be installed in the retention pond to maintain water quality.